Admin & Library Building Construction for Madrasa Farouqiya

Madrasa Farouqiya

Currently, the madrasa lacks sufficient administrative space and an organized library facility. This project will construct the first floor of the Admin and Library Building, based on the approved BoQ and technical drawings.

 Scope of Work:

  • Structural works (foundation, columns, slabs, stairs)
  • Architectural works (walls, plastering, flooring, doors, windows)
  • Electrical installation
  • Water supply and sanitation systems
  • Sewerage and drainage works
  • Roof insulation and waterproofing
  • External finishing works

This building will serve as the central administrative hub and a structured academic library, significantly improving governance, organization, and educational quality.

Scroll to Top